Supergalactic Trash Collector
A downloadable game for Windows, macOS, and Linux
You’re a garbage collector… in space! And you drive a space garbage truck! The game features five levels containing a lot of garbage, dangerous asteroids, explosions, realistic physics, a heartless boss and much more! (actually, maybe only one or two things)
Made as part of the ludum-dare 58 edition.
https://ldjam.com/events/ludum-dare/58/supergalactic-trash-collector
| Status | Prototype |
| Platforms | Windows, macOS, Linux |
| Author | Fullbuff |
| Genre | Simulation |
| Tags | 2D, Godot, Ludum Dare, Physics, Pixel Art, Sci-fi, Singleplayer, Space, Top-Down |
| Content | No generative AI was used |
Download
Install instructions
- macOS: Unsigned build. On first launch, Right-click → Open → Open (or go to System Settings → Privacy & Security → Open Anyway). Advanced:
xattr -dr com.apple.quarantine "Supergalactic Trash Collector.app" - Linux: x86_64 build; works on distros with glibc ≥ 2.28 (e.g., Ubuntu 20.04+, Debian 11+, RHEL/Alma/Rocky 9+).




Comments
Log in with itch.io to leave a comment.
Show post...
This game has a lot of potential. I hope we get a lot more